Many lifting equipment delivery delays aren’t caused by the provider, but by the site itself not being ready to receive the machine. Here’s a quick checklist before your delivery date.
Ground and space
- Confirm the ground can bear the loaded equipment’s weight, especially on newly poured or incomplete floors.
- Check there’s enough maneuvering space and turning radius, especially for man lifts and boom lifts in tight areas.
- Clear any temporary obstacles (building materials, containers, parked vehicles) from the expected access path.
Access and delivery
- Make sure the site entrance fits the delivery truck, not just the equipment itself.
- Prepare entry permits for the driver/team if the site requires prior security clearance (factories, restricted industrial zones).
- Designate someone on-site responsible for receiving the equipment and signing the delivery form.
Safety before operation
- Check for overhead power lines or obstacles in the expected reach path for elevated-work equipment.
- Prepare a safe storage area for the equipment during non-operating hours if needed.
Bottom line
A ready site means faster delivery and immediate work start with no delay. When requesting a quote from Al-Fareed, describe your site and we’ll tell you in advance about any requirements specific to the equipment you’ve requested.